Nexus Concordat. Gold dragon in a hexagonal frame beside the wordmark.
Working Session · Wednesday June 24 2026 · 1:00 to 2:30 PM PT · Gang of 3 + Shailee

Working Session

Six topics. Mayo Waypoints September 20 is the spine. ISTAND is now Robert-confirmed best fit. The shotgun approach to parallel programs, the Aug 31 business-plan milestone, training plan, MAYO.md, and the web pages all feed into it.

Attendees

Agenda at a glance

#TopicLeadTime
1Mayo Waypoints statusMarjorie10 min
2ISTAND pathway (Robert confirmed best fit) and shotgun approach to parallel programsRobert and Marjorie15 min
3Training plan update. What we have learned. What we are doing.Marjorie and Aislinn15 min
4Where do we want to be by Aug 31. Business plan dust-off.Jason lead, all input15 min
5Web pages walkthrough (incl. NeXus LOI live draft)All10 min
6Decisions, next steps, Shailee onboarding laneAll10 min

1. Mayo Waypoints status 10 min

The Mayo Clinic Berg Innovation Exchange Waypoints Program application is due September 20, 2026. Selection decisions September 28. Program runs October through December.

We are invited by David Kim, Business Analyst at the Berg Innovation Exchange, following his June 22 personalized invitation.

Application page status

Live working draft at /mayo.html. Pages 1 through 4 of the application have placeholder drafts. Structure is in place. Polishing happens after Jason, Aislinn, and Robert review.

What we are positioning as

A psychiatry residency training simulation platform built on our patent pending neurochemical cascade architecture. Non device. Non diagnostic. Training infrastructure that complements (and partially replaces) standardized patient actor programs.

Bios needed. Robert and Jason each send Marjorie their preferred title, role description, and LinkedIn URL for the Mayo page and elsewhere. We are not filling these in for either of you.

2. ISTAND pathway and the shotgun approach 15 min

Robert's confirmation (June 23 LinkedIn thread): “Regarding ISTAND for Biomarkers (likely best fit for N/C), yes let's chat about that. Just promoting that N/C has submitted a ISTAND appln is GOLD, boost credibility in eyes of Mayo Clinic.”

ISTAND is confirmed as the regulatory pathway. The Mayo credibility lever (a submitted ISTAND application in past tense by September 20) is now Robert's framing, not just ours.

The LOI we have drafted

Live working draft at /nexus-loi.html. NeXus framed as deployment of the patent-pending Aether neurochemical cascade architecture. CoU statement at 270 characters. Six-layer proof framework. Appendix A formalizes the opcode definition and fidelity verification protocol. Walk through during this section so everyone is on the same page.

The shotgun approach (Robert's direction)

Per Robert: “Find one or two other similar programs (incubators, investor pools, etc) and generate a core application but tailor to each one. Shotgun approach toward finding resources and potential partners.”

Candidates to scope tonight or in this meeting:

Working CoU (locked into the LOI)

In-silico simulation environment to model biomarker dynamics, interactions, and perturbation responses for hypothesis generation in psychiatric drug development, supporting design of subsequent clinical confirmation studies of candidate biomarker contexts of use.

Open question for Robert

The new operating entity. We are forming NeXus Neuroinformatics, Inc. as the FDA-facing entity so it (not Nexus Concordat Inc.) is the Requester. Form before or after LOI submission? Same Harvard Business Services / Delaware C-Corp path as DH Inc.?

3. Training plan update. What we have learned. What we are doing. 15 min

Status of the technical work. Aislinn, Jason, and Robert need the same picture.

What is live (already shipping)

What landed in the last week

What is happening next

What is in the queue but not yet started

4. Where do we want to be by Aug 31. Business plan dust-off. 15 min

Robert's framing for this section, June 23: “dust off the basic business plan and figure out where you want to be or should be by Aug 31st.”

Aug 31 sits about three weeks before the Mayo Waypoints application deadline (Sept 20). The business plan needs to be coherent enough by Aug 31 to support the Mayo application without scrambling in the final two weeks.

Decisions Jason should drive in this section

What Jason and Robert each need from Marjorie

4b. MAYO.md update. Reset the target. 5 min

The MAYO.md file at /home/nexus_concordat/scyla-nca/MAYO.md is the canonical target spec for the prototype. It says, verbatim: the product is the game; the game funds the research; the game is also the safe simulation environment; do not train it to diagnose; train it to support synthetic state simulation.

What needs updating in MAYO.md

The rule MAYO.md enforces and we keep losing. The product is the game. The simulation is the game. The game is the safe sandbox the research lives inside. Every claim we make about the technology stays inside that frame. Any regulatory framing is downstream, not the central pitch.

5. Web pages walkthrough 10 min

Walk through each page live. Take comments. Capture factual corrections.

PageWhat it is
patent.nexusconcordat.comPortfolio home, public face
/mayo.htmlMayo Waypoints application working draft
/nexus-loi.htmlNeXus LOI working draft (new tonight; review during section 2)
/our-training-method/Four head method explainer (originally for Jason)
/cell-demo.htmlLive cardiac specialist with signed manifests
/jason-plan.htmlArchitectural plan (cell as opcode tree)
/sister-cell.htmlTraining plan and trajectory
Standing rule. Anything factually wrong on any page gets logged during the walkthrough and corrected the same day. Anything bio related (Robert, Jason) waits for the named person to send the text directly. We do not invent or paraphrase bios.

6. Decisions, next steps, Shailee onboarding lane 10 min

Decisions to extract

  1. ISTAND July artifact. Pre-LOI meeting request package, Letter of Support, or full LOI submission. Robert calls.
  2. NeXus Neuroinformatics Inc. formation timing. Before or after LOI submission. Jason and Marjorie call together.
  3. Shailee reporting line. Under Robert (regulatory natural fit), under Marjorie (CEO direct), or under Aislinn (COO operational). Decide so Shailee has one named supervisor.
  4. Mayo sign off cadence. When do Aislinn, Jason, and Robert each pass the application sections they are responsible for? Target: Aug 31 review-ready, Sept 15 final.
  5. Aug 31 business plan commit. Per Robert's prompt. Jason owns.
  6. MAYO.md update. Marjorie updates this week. Anyone want review rights before commit?
  7. Next sync cadence. Weekly through July, then twice monthly through September?

Shailee onboarding lane (new)

Open items if time